Description
Louw Group was engaged by Darwin International Airport to prepare comprehensive as-built architectural documentation for Mercure Darwin Airport Resort Blocks 1 and 2, accurately capturing final constructed conditions for future asset management, compliance and refurbishment planning. The commission included detailed site verification, preparation of overall floor plans for both accommodation blocks, documentation of six room types including accessible DDA-compliant rooms, and production of internal layouts and elevations reflecting completed built conditions.
The work required careful coordination within an operational hospitality environment to ensure the final documentation accurately reflected existing site conditions and operational room configurations.
Details
Project
Mercure Blocks 1&2 As Cons
Project Date
2025
Client
Darwin International Airport Pty Ltd
Sector
Hospitality / Accommodation / Aviation Infrastructure
Location
Darwin Airport Resort, 1 Henry Wrigley Drive, Eaton, Northern Territory
KEY OUTCOMES
- Delivered complete as-built floor plans for two accommodation blocks
- Documented six accommodation room typologies including DDA-compliant units
- Improved asset records for future maintenance and refurbishment planning
- Supported accessibility compliance documentation for airport accommodation facilities
- Provided accurate architectural base documentation for future upgrade works
OUR ROLE
- Architectural as-built documentation
- Site verification and measured
- DDA room assessment and documentation
- Room type planning and elevations
- Existing building coordination
- Issue of final as-built drawing package